Wady Central

Plan from real orders, minus what you already hold.

Plan from real orders, minus what you already hold.

Production is part of Wady Central, the paid system for kitchens in Qatar: one system for your stock, recipes, purchasing and kitchen costs. It fits one café, and it fits a group with outlets and a central kitchen. The production plan builds from real orders, minus what's already in stock, with sub-recipes pulled in and rounded to real batches. Record a run: ingredients out, product in, at true recipe cost. And the chef stays in charge of the call.

How it works

01 / 04
خطة الإنتاج
طلبات اليوم
ناقص: بالمخزون
الكرواسون
المطلوب إنتاجه
صوص البيت
وصفة فرعية

Coming soon

Production

The plan

الطلبات
طلب
طلب
طلب
بالثلاجة
اللي عندك
ينطرح
خطة الإنتاج
دفعات حقيقية، مب كسور
دفعة
دفعة
دفعة
دفعة
دفعة
دفعة
Built from real orders, not a guess.

No guesswork in the plan. The orders are in front of you, what's already in the fridge comes off, and what's left is real batches, not fractions nobody can cook.

From real orders, minus stock

Sub-recipes pulled in

Rounded to real batches

From plan to purchase

قائمة الشراءمن الخطة
طحين
+ فاقد
سكر
+ فاقد
رز
+ فاقد
مقرّبة لأكياس حقيقية
The purchase list already knows about trim.

The same plan produces the purchase list, trim already counted in and rounded to real sacks. Nobody works out trim by hand, and nobody forgets it.

One purchase list from the plan

Trim counted in

Rounded to real sacks

The run

ش
الشيفسجّل دفعة إنتاج
بالوصفة
طحين
زبدة
سكر
الفعلي
طحين
زبدة
↑
سكر
ينسجل اللي انستخدم فعلاً
What the cook used wins, every time.

What gets recorded is what was actually used, not what the recipe said. Reverse a run, and it reverses at that day's values. The chef makes the call, not a machine.

Ingredients out, product in, at recipe cost

Actual use beats the recipe on paper

Reverse in full or in part

FAQ

Does the plan account for what's already in stock?
Does the purchase list already account for waste in prep?
What if the cook uses more than the recipe says?
Can I undo a production run I entered wrong?
Does the system decide how much to produce on its own?

From orders to a plan the chef trusts.

Talk to us, and we'll show you on your own setup. See a real order turn into a production plan, live. 20 minutes.